Boler
renovation updated!
I have been keeping busy with more jobs this week. Getting ready for my first trip this coming weekend!
Sawcut Arizona Allure Vinyl flooring from home depot. Only needed one box of 8 boards to do it! I used 1/2 pine trim and stained it to make it match the floor more. PL premium and nail gun to lock the trim in place.
Installed simple shelves into storage closet. Size based on height of canned goods and Mason jars.
3
LED lights installed under each cabinet. Really hally with the clean
light they give off. (New DC converter om it's way in the mail, old ones bridge rectifier has burnt out).
New shurflo pump installed with cleaned original water tank, new water lines. Waiting on completing the final
electrical connections.
4 new LED running
lights installed bought from princess auto. Sealed them in with butyl tape. Used a fine knife to remove any squeeze out. Should keep me very visible on the road at night.
Propane line reconnected and inspected. New stove is working well. Also original
fridge is also working well via
propane 12v, and 120v hook ups.