removed gaucho bunks and installed flush toilet, dinette and bench bed. Painted ensolite. Removed old three-way fridge and replaced with 2.5 amp electric compressor fridge. New roof vent. Stitched vinyl seam tape. Laminate floor. Water pump and accumulator with switchable water sources.
Exterior
Reinstall jalousie windows with new butyl tape. Paint front window cover and trim with door-edge trim, same treatment on wheel wells. Sewer connection. Scissors jacks bolted to frame. New axle, wheels and tires. Custom spare tire cover. 8 ft awning rail bolted to roof with 8x10 ft heavy polyester awning from CT&A. Frame-off inspection slated for 2012.