We have tried to preserve the original footprint by just cleaning and taking time with the original sink and refrigerator, cabinet doors and lights. We upholstered the cushions with indoor/outdoor material so they could be removed and washed when needed. Layed new floor and had door latch rebuilt. Added shelves inside the closet.
Exterior
New vent, new band, sealed windows and painted. New logos. New tires, checked hubs and frame.
Renovations
Replaced flooring, scraped and sanded walls, replaced ceiling vent, band, repaired window seals.
Upholstery etc.
Other Information
Although there had been water leaks and the entire walls had been been decoupaged and all kinds of crazy paint and paintings were on the exterior, it was in sound shape. It took almost a year of sanding, scraping, etc but we love it now!