Things we did:
Removed belly band and fibre glassed the holes and painted
Resealed all
windows with butyl tape (replaced rear window because of A/C unit that was an eyesore)
Replace 9 1/2" roof vent with 14" fan
Removed all old wiring (12volt and 110volt)
Installed power convertor (never had one)
Installed
battery and
battery box (never had one)
Installed all led
lighting for interior and exterior (also added a 3rd brake light)
Installed USB ports and 12volt lighter ports for extra plugs
Removed poorly installed indoor/outdoor carpet from walls and cleaned up left over ensolite insulation which was never removed 100%
Painted all cabinets white
New maple cabinet doors and new hinges throughout
Installed shelves in closet
Insulated with reflectex and then installed a quality hull liner material
Removed old water tank and installed smaller tank under sink
Replaced both water faucets
All new cushions and covers
All new curtains
New foam floor covering
Full exterior cleaning and then Zep treatment
Painted all vent covers
Installed an
awning rail (never had one) and had an
awning made
Added a utility box on rear and moved spare tire (had minion face made for cover)
Added
brakes along with new rims and
tires
Added CO detector and smoke alarm
I think that's about all. No wonder in took 7 months.