Front bunks removed and SeaLand Toilet with Blackwater tank added. Wall and door added for privacy (partial bathroom).
Battery moved to exterior (rear bumper).
Back bench removed and table modified (lengthened) to hook up to rear wall of U Haul with collapsable leg.
Exterior
Renovations
In preparation for frame-off complete reno:
Replace all wiring, plumbing, gas. Replace converter/inverter/ solar charger. Re-weld rusted tube frame, replace swamp-cooler with fantastic fan, remove carpet and replace with wood laminate, replace old paneling (bathroom wall/door) with new cedar panelling.
Add in-line charger hardware from TV to U Haul.
Add spare tire mount.