Rebuilt the entire interior. The bed boxes and cabinets were all redone, centered around the refrigerator.
New flooring, bulkheads, shelves and custom doors.
Exterior
The pop-top was removed as well as the fabric skirt. The diamond tuck insulation was removed and replaced with a marine headliner.
The tongue box was added to a cleaned up tongue with new electrical 7-pin connector.
And new awnings were installed.
Customization
New bulkheads were designed to hug the walls and all cabinets were boxed in to hide the electrical and back walls.
New LED lights were installed and a new fuse box sends power to new wall plugs.
Side window awnings needed newly designed hardware for mounting.
Renovations
This trailer has upgraded 14" wheels mounted to an axle with brakes.
The old two door closet with porta-potty was opened up to include a shelf for kitchen appliances and a wall plug.
New Allure flooring was installed. Plus, BAL stabilizers on all four corners.