Some pics from the process so far. new gelcoat, belly band replaced with automotive u-trim, new radiused
windows on sides new acrylic windows front and back. removed cooler
fridge redesigned that area for storage with a shelf, new breaker panel(Scamp Parts) three new 120v circuit's, all new 12v
LED lights, removed water tank disinfected replumbed all new tubing, new wheels and
tires, new wood cupboard doors and covers on seat bench's, new laminate flooring, new primer and interior
paint, new foam and upholstery, tons of body work as it had been drug down highway on the drivers side before i got it. new C-channel welded onto frame for strength, new roof vent with 12volt fan
left to do counter top with extension over the the sofa.
contemplating removing stove top and going with a portable two burner Coleman for more counter space